AHTS Upperworks Build
Stacks being fitted to the base. The outer sheet is full height, the inner walls are only to ceiling height. The boxes are going to hold the base and ceiling in the correct orientation while the walls are fitted. |
16(33)
Copyright Mike Sheridan, 2012-2013
Created with Web Picture Creator 1.8