Home      Up

HO 'Steelworks' structures

 

 

Blast Furnace Wiring 5

Blast Furnace Wiring 5

A hole was made in the main baseboard to allow the plug to be inserted in the socket when the model was in place. You can also see the way the main baseboard fibreboard has been cut away to allow the furnace board to drop in. The slightly elaborate shaping should avoid too much of a visible 'joint' and also locates the boards so that the tracks align exactly.

10(43)

Copyright Mike Sheridan, 2003-2009

Created with Web Picture Creator 1.8