HO 'Steelworks' structures
At the entrance to the highline a track ducks underneath at an angle. The geometry required quite a long span and this was actually the third bridge kit I bought to do the job. To fit with the various needs and constraints I needed to put a turnout on the bridge. The first plans were to make the span wedge-shaped, but this double track bridge provided an alternative solution. |
33(43)
Copyright Mike Sheridan, 2003-2009
Created with Web Picture Creator 1.8