<<-- Previous
index
Next -->>
Highline Bridge 7
The tracks and deck were painted and weathered with an airbrush before the rest of the bridge was assembled.
39(43)
Copyright Mike Sheridan, 2003-2009
Created with Web Picture Creator 1.8