Home      Up

HO 'Steelworks' structures

 

 

Highline Bridge 7

Highline Bridge 7

The tracks and deck were painted and weathered with an airbrush before the rest of the bridge was assembled.

39(43)

Copyright Mike Sheridan, 2003-2009

Created with Web Picture Creator 1.8