Kelpie Canyon Railroad
Sketch of railroad. Gradient started at A and continued to B. The depot areas were level. The future parts were allowed for but were never installed. The trestle was under construction in the early stages and is missing from the earlier photos. The detail trackwork of the depots is not shown. |
11(11)
Copyright Mike Sheridan, 2003
Created with Web Picture Creator 1.50