AHTS Hull Build
With the hull right way up the inside of the opening and plastic trims were heavily epoxied for strength and watertighting.
The threaded rod is tapped through the hull piece and top of the Kort and epoxied in place. As the prop assembly is fairly vulnerable and possibly stressed with vibration eventually a beam will span the gap as shown by the green marks and a nut will be pulled down to provide a mechanical backup to the glue. |
52(90)
Copyright Mike Sheridan, 2012
Created with Web Picture Creator 1.8