Home      Up

AHTS Hull Build

 

 

Power distribution 2

Power distribution 2

This is looking back towards the location of the previous picture into the well below the superstructure. The back of the battery rests against the bulkhead seen before.The battery is located by guides each side at the top and a stop screwed in place at the bottom. You can just see the main battery fuse (green) on the top to the left.

On the upper right is a tray for the r/c servo leads to the receiver and lower right is the auxiliary distribution board.

93(95)

Copyright Mike Sheridan, 2012

Created with Web Picture Creator 1.8