Home      Up

AHTS Upperworks Build

 

 

Bridge 10

Bridge 10

On the basic Aziz the side skins are flat and vertical which supports the roof at the correct height. Angled sides don't provide that positive location for my deckhead. The stacks do the job in the centre/aft area but to ensure the correct location at the forward end I made and tacked in place a temporary wall piece while fitting and gluing the side skins.

The front edge of the deckhead was a little bowed, so a piece of plastic is also tacked on the top edge to keep it straight until the front skin is fitted and glued solidly in place.

You can also see the doors next to the stacks.

24(33)

Copyright Mike Sheridan, 2012-2013

Created with Web Picture Creator 1.8