Home      Up

AHTS Upperworks Build

 

 

Bridge 11

Bridge 11

Another trial placement with the forward three skins fitted and the temporary fixtures removed. The brass pipe between the stacks is the basis of the mast - more on that as the build progresses.

25(33)

Copyright Mike Sheridan, 2012-2013

Created with Web Picture Creator 1.8